Project location: Dongying, Shandong
Building scale: 58,218 m²
Arched truss, ultra-large span; intelligent manufacturing precision, green innovation.
The coal storage shed in Coal Storage and Transport Area No. 2 of the Dongying Mingsheng Railway Logistics Park adopts a 119-meter-span arched steel truss membrane structure, with ground sectional assembly, sectional hoisting, and high-altitude closure; BIM parametric control is used to manage fabrication and closure accuracy; fully enclosed dust suppression is implemented, and dust, welding fume, and noise control measures are carried out during construction, achieving the integration of large span, intelligent manufacturing precision, and green construction.






