Civil Engineering Construction Tells You: Master the Principles and Scope of Bidding Activities
1. Bidding activities shall follow the principles of openness, fairness, impartiality, and good faith.
Annotation: (1) The principle of openness first requires the disclosure of bidding information, and also requires the openness of the bidding process.
(2) The principle of fairness requires equal opportunities and equal rights for all bidders, without excluding or discriminating against any bidder for any reason.
(3) The principle of impartiality requires evaluating the merits of each bid according to uniform standards.
(4) The principle of good faith.
2. Scope and Scale Standards for Projects Requiring Bidding
(1) Scope of Engineering Construction Projects Requiring Bidding
The following engineering construction projects conducted within the territory of the People's Republic of China, including the survey, design, construction, supervision, and procurement of important equipment and materials related to the project construction, require bidding:
1. Projects such as large-scale infrastructure and public utilities that concern public interest and public safety;
2. Projects invested wholly or partially with state-owned funds or financed by the state;
3. Projects using loans or aid funds from international organizations or foreign governments.
(2) Scale standards for projects requiring tender
The various types of construction projects specified in the "Provisions on the Scope and Scale Standards for Tender of Construction Projects" include surveying, design, construction, supervision, and the procurement of important equipment, materials, etc. related to the construction. If any of the following standards are met, tender is required:
1. The estimated contract price of a single construction contract is RMB 2 million or more;
2. The estimated contract price of a single contract for the procurement of important equipment, materials, and other goods is RMB 1 million or more;
3. The estimated contract price of a single contract for the procurement of services such as surveying, design, and supervision is RMB 500,000 or more;
4. The estimated contract price of a single contract is lower than the standards specified in items 1, 2, and 3, but the total investment of the project is RMB 30 million or more.
III. Construction projects that may be exempted from tender
If a construction project does not fall within the scope of projects requiring tender, it may or may not be tendered. However, even if it meets the conditions for a project requiring tender, it may still be exempted from tender under certain special circumstances.
For construction projects, bidding may be waived by law under any of the following circumstances:
1. Involving national security, state secrets, or emergency rescue and disaster relief, making bidding inappropriate;
2. Projects that use poverty alleviation funds for work-relief programs requiring the employment of migrant workers;
3. The main construction technology adopts specific patents or proprietary technologies;
4. Self-built and self-used projects by construction enterprises, where the enterprise's qualification level meets the project requirements;
5. Additional minor auxiliary projects or main structure extension projects of an ongoing project, where the original winning bidder still has the contracting capability;
6. Other circumstances stipulated by laws and administrative regulations.
IV. Legal Liability
1. Legal liability for evading bidding (5‰ to 10‰)
For projects that should undergo bidding but are not bid, or are broken into smaller parts or evaded by any other means, a deadline for correction shall be set, and a fine of not less than 5‰ and not more than 10‰ of the project contract amount may be imposed; for projects wholly or partially using state funds, project execution or fund allocation may be suspended; the directly responsible supervisors and other directly responsible personnel shall be given administrative sanctions according to law.
2. Legal liability for affecting fair competition (fine of not less than 10,000 yuan and not more than 50,000 yuan) Fair competition
(1) If the tenderee restricts or excludes potential bidders with unreasonable conditions, treats potential bidders with discriminatory treatment, forces bidders to form a consortium to bid jointly, or restricts competition among bidders, the tenderee shall be ordered to make corrections and may be fined not less than 10,000 yuan and not more than 50,000 yuan.
(2) If the tenderee of a project that is required to be tendered according to law discloses to others the names or quantities of potential bidders who have obtained the tender documents, or other information related to the tender and bid that may affect fair competition, or divulges the bid base price, a warning shall be given, and a fine of not less than 10,000 yuan and not more than 100,000 yuan may also be imposed; the directly responsible supervisors and other directly responsible personnel of the unit shall be given disciplinary action according to law; if a crime is constituted, criminal liability shall be pursued according to law.
1072 Master the requirements for bidding
I. Qualification requirements for bidders
A bidder shall have the capability to undertake the tendered project; if the relevant state regulations or the tender documents stipulate qualification conditions for bidders, the bidder shall meet the stipulated qualification conditions.
II. Bid documents
(1) Preparation of bid documents
A bidder shall prepare bid documents in accordance with the requirements of the tender documents. The bid documents shall respond to the substantive requirements of the tender documents. If the tendered project involves construction, the bid documents shall include the resumes and performance records of the proposed project leader and key technical personnel, as well as the mechanical equipment intended for use in completing the tendered project.
(2) Bid security
1. Concept of Bid Security
The so-called bid security is a form of guarantee set by the tenderer in the tender documents to prevent bidders from bidding carelessly. The tenderer generally does not expect bidders to withdraw their bids at will during the bid validity period or to fail to submit performance security and sign the contract after winning the bid. Therefore, in order to constrain bidders' bidding behavior, protect the tenderer's interests, and maintain the normal order of tendering and bidding activities, the tenderer usually requires bidders to provide bid security.
The tenderer has the right to confiscate the bid security in the following circumstances:
(1) The bidder withdraws its bid documents during the bid validity period;
(2) The winning bidder fails to submit performance security or sign the contract agreement within the prescribed time limit.
2. Amount and Validity Period of Bid Security
In addition to cash, bid security may be in the form of a bank guarantee, certified check, bank draft, or cashier's check issued by a bank. The bid security generally shall not exceed 2% of the total bid price, but shall not exceed RMB 800,000. The validity period of the bid security shall extend thirty days beyond the bid validity period. The bidder shall submit the bid security together with the bid documents to the tenderer in the manner and amount required by the tender documents. If a bidder fails to submit bid security as required by the tender documents, its bid documents will be rejected and treated as invalid.
(2) Submission of Bid Documents
The bidder shall deliver the bid documents to the bid submission location before the deadline for submission of bid documents specified in the tender documents; bid documents delivered after the deadline shall be rejected by the tenderer. Upon receipt of the bid documents, the tenderer shall sign for and keep them in custody without opening them. If there are fewer than three bidders, the tenderer shall re-tender in accordance with the law.
(3) Supplement, Amendment, Replacement, or Withdrawal of Bid Documents
Before the deadline for submission of bid documents specified in the bidding documents, a bidder may supplement, modify, or withdraw the submitted bid documents and shall notify the tenderee in writing. The supplemented or modified content shall be part of the bid documents.
After the deadline for submission of bid documents and before the expiration of the bid validity period specified in the bidding documents, a bidder shall not supplement, modify, replace, or withdraw its bid documents. If a bidder supplements, modifies, or replaces its bid documents, the tenderee shall not accept them; if a bidder withdraws its bid documents, its bid bond will be forfeited.
1073 Understanding Joint Bidding
I. Definition of Joint Bidding
Two or more legal persons or other organizations may form a consortium to jointly bid as one bidder.
Joint bidding has the following characteristics:
1. It is composed of two or more bidders;
2. The tenderee signs only one contract with the consortium after winning the bid, rather than signing contracts with each member unit.
II. Qualification Conditions of Consortium Members
(I) Each member of the consortium shall have the corresponding capability to undertake the bidding project;
(2) Where there are relevant national regulations or tender documents stipulating the qualifications of bidders, all parties to the joint venture shall meet the corresponding qualification requirements;
(3) For a joint venture formed by units of the same profession, the qualification level shall be determined based on the unit with the lower qualification level.
3. Joint Bidding Agreement and Joint Liability
(All parties to the joint venture shall sign a joint bidding agreement, clearly defining the work and responsibilities each party undertakes, and submit the joint bidding agreement together with the bid documents to the tenderer;
(1) Fulfill the responsibilities stipulated in the joint bidding agreement
The responsibilities stipulated in the joint bidding agreement also represent the method of responsibility allocation among the member units.
(2) Assume joint liability for the winning project
(3) No duplicate bidding
After signing the joint bidding agreement, each party to the joint venture shall not bid individually under its own name, nor form a new joint venture or participate in other joint ventures in the same project;
(4) No arbitrary changes to the composition of the joint venture
If a consortium passes the pre-qualification review, any change in its composition must be approved by the tenderee before the deadline for submission of bid documents;
(5) A lead member representing the consortium is required
Each party to the consortium shall designate a lead member, authorize it to represent all consortium members in handling and coordinating the bidding and contract implementation phases, and shall submit to the tenderee an authorization letter signed by the legal representatives of all consortium members.
When bidding as a consortium, the bid bond shall be submitted in the name of all consortium parties or the lead member of the consortium. A bid bond submitted in the name of the lead member of the consortium is binding on all members.
If the consortium wins the bid, all consortium parties shall jointly sign the contract with the tenderee and bear joint and several liability to the tenderee for the contracted project.
1074 Master the provisions prohibiting bidders from engaging in unfair competition practices
I. Bidders colluding with each other on bid prices.
The following acts all constitute bid price collusion among bidders:
(1) Bidders mutually agree to raise or lower bid prices;
(2) Bidders mutually agree to quote high, medium, and low prices respectively for the tendered project;
(3) Bidders first conduct internal bidding among themselves, predetermine the winning bidder, and then participate in the tender;
(4) Other acts of collusive bid quoting among bidders.
II. Bidders colluding with the tenderee in bidding.
The following acts all constitute collusion between the tenderee and bidders in bidding:
(1) The tenderee opens bid documents before bid opening and informs other bidders of the bid situation, or assists bidders in replacing bid documents or changing quoted prices;
(2) The tenderee discloses the bid bottom price to bidders;
(3) The tenderee and bidders agree to lower or raise bid prices during bidding, with additional compensation to the bidder or tenderee after winning the bid;
(4) The tenderee predetermines the winning bidder in advance;
(5) Other acts of collusive bidding.
III. Seeking to win the bid by bribing the tenderee or members of the evaluation committee.
A bidder who seeks to win a bid by bribery is committing an illegal act that seriously violates the basic principles of the Bidding and Tendering Law and is unfair to other bidders. The legal consequence of a bidder winning a bid through bribery is that the award is invalid, and the responsible persons and units shall bear corresponding administrative or criminal liability; if losses are caused to others, they shall also bear civil compensation liability.
IV. Bidding at a price below cost
The Bidding and Tendering Law stipulates that "bidders shall not bid at a price below cost." Here, the so-called "cost" should refer to the bidder's individual cost, which is generally determined based on the bidder's enterprise quota.
V. Bidding in the name of others or otherwise resorting to fraud to obtain the award.
A bidder shall not bid in the name of others or otherwise resort to fraud to obtain the award. Bidding in the name of others refers to acts such as a bidder attaching itself to another construction unit, obtaining qualification or qualification certificates from another unit through transfer or lease, or having another unit and its legal representative affix seals or signatures on the bid documents prepared by the bidder itself.
II. Legal liability (invalid award)
1. Legal liability for collusive bidding
The bidder shall be fined not less than 5 per thousand and not more than 10 per thousand of the bid amount; the directly responsible person in charge of the unit shall be fined not less than 5 percent and not more than 10 percent of the unit fine, and the unit shall be disqualified from participating in projects requiring tendering for one to two years, with public announcement.
2. Legal liability for fraudulently obtaining the award
The bidder shall be fined not less than 5 per thousand and not more than 10 per thousand of the bid amount; the directly responsible person in charge of the unit shall be fined not less than 5 percent and not more than 10 percent of the unit fine, and the unit shall be disqualified from participating in projects requiring tendering for one to three years, with public announcement.
1075 Mastering the Bid Opening Procedure
According to the Tendering and Bidding Law and relevant regulations, the bid opening shall follow these procedures:
The bid opening shall be conducted publicly at the same time as the deadline for submission of bid documents specified in the tender documents; the bid opening location shall be the place predetermined in the tender documents. The bid opening is presided over by the tenderer, and all bidders are invited to participate. During the bid opening, the bidders or their elected representatives shall inspect the sealing condition of the bid documents, or a notary institution entrusted by the tenderer may inspect and notarize them; after confirmation of no errors, the staff shall publicly unseal the documents and announce the bidder names, bid prices, and other main contents of the bids. The bid opening process shall be recorded and archived for future reference.
The tenderer shall not accept bid documents under any of the following circumstances:
1. Those submitted after the deadline or not delivered to the designated location;
2. Those not sealed in accordance with the requirements of the tender documents.
1076 Mastering the Regulations on the Bid Evaluation Committee and Evaluation Methods
I. Bid Evaluation Committee
(I) Composition of the Bid Evaluation Committee
The bid evaluation is the responsibility of the bid evaluation committee lawfully formed by the tenderer. For projects that require tendering by law, the bid evaluation committee shall consist of representatives of the tenderer and experts in relevant technical, economic, and other fields, with an odd number of members totaling five or more, of which the number of experts in technical, economic, and other fields shall not be less than two-thirds of the total members. The list of members of the bid evaluation committee shall be kept confidential until the winning bidder is determined.
(2) Selection of Bid Evaluation Experts
Technical, economic, and other bid evaluation experts shall be determined by the tenderer from the expert roster provided by the relevant departments of the State Council or the people's governments of provinces, autonomous regions, or municipalities directly under the Central Government, or from the expert database of the bidding agency's relevant specialties. For general bidding projects, random selection may be adopted; for projects with particularly complex technology, exceptionally high professional requirements, or special national requirements, where experts selected through random drawing are deemed inadequate, the tenderer may directly appoint them. Members of the bid evaluation committee shall perform their duties objectively and impartially, abide by professional ethics, and bear personal responsibility for the evaluation opinions they provide.
Members of the bid evaluation committee and staff involved in bid evaluation activities shall not disclose the evaluation and comparison of bid documents, the recommendation of winning candidates, or other information related to the bid evaluation. "Staff involved in bid evaluation activities" refers to all personnel other than members of the bid evaluation committee who become aware of relevant bid evaluation information due to participation in bid evaluation supervision or administrative tasks.
II. Bid Evaluation
(1) Standards and Methods for Bid Evaluation
The tenderer shall take necessary measures to ensure that bid evaluation is conducted under strict confidentiality. No unit or individual may illegally interfere with or influence the process or results of bid evaluation. The bid evaluation committee shall evaluate and compare bid documents in accordance with the bid evaluation standards and methods specified in the bidding documents; if a base price is set, it shall be referenced.
(2) Circumstances for Treating Bids as Invalid
1. Without the company seal and without the signature or seal of the legal representative or an authorized agent of the legal representative;
2. Not filled in according to the prescribed format, with incomplete content or illegible key handwriting;
3. The bidder submits two or more bid documents with different contents, or submits two or more quotes for the same bidding project in one bid document without declaring which one is valid, except where alternative bid proposals are submitted as specified in the bidding documents;
4. The bidder's name or organizational structure is inconsistent with that during the prequalification;
5. The bid bond is not submitted as required by the bidding documents;
6. A joint venture bid does not include a joint bidding agreement signed by all parties.
Further additions to the circumstances that should be considered as bid rejection:
1. No power of attorney issued by the legal representative;
2. The bidder's name or organizational structure is inconsistent with that during the prequalification and no valid proof is provided;
3. The bid validity period does not meet the requirements of the bidding documents.
The bid evaluation committee may reject all bids. If all bids for a project that requires bidding by law are rejected, the tenderee shall conduct a new bidding process in accordance with the law.
(3) Clarification, explanation, and correction of bid documents. The bid evaluation committee may request bidders to provide necessary clarification or explanation of unclear content in the bid documents, but such clarification or explanation shall not exceed the scope of the bid documents or alter their substantive content.
When evaluating the bid price of a bid that substantially responds to the requirements of the bidding documents, the bid evaluation committee shall make corrections in accordance with the following principles, unless otherwise specified in the bidding documents:
1. If the amount expressed in digits is inconsistent with the amount expressed in words, the amount in words shall prevail;
2. If the product of the unit price and the quantity is inconsistent with the total price, the unit price shall prevail. If there is an obvious decimal point misplacement in the unit price, the total price shall prevail, and the unit price shall be corrected. The adjusted quotation shall become binding after confirmation by the bidder.
(4) Bid Evaluation Report and Bid Winning Candidates
1. Bid Evaluation Report
After completing the bid evaluation work, the bid evaluation committee shall submit a written bid evaluation report to the tenderee and send a copy to the relevant administrative supervision departments.
The bid evaluation report shall be signed by all members of the bid evaluation committee. Members of the bid evaluation committee who disagree with the bid evaluation conclusion may state their differing opinions and reasons in writing. Members of the bid evaluation committee who refuse to sign the bid evaluation report and do not state their differing opinions and reasons shall be deemed to agree with the bid evaluation conclusion. The bid evaluation committee shall provide a written explanation and record this accordingly.
2. Bid Winning Candidates
The bid winning candidates recommended by the bid evaluation committee shall be limited to one to three persons, and the ranking order shall be indicated.
The bid of the winning bidder shall meet one of the following conditions:
(1) It can best meet the various comprehensive evaluation standards specified in the tender documents; (high score takes precedence)
(2) It can meet the substantive requirements of the tender documents, and the evaluated bid price is low; except when the bid price is lower than the cost.
The bid evaluation committee may reject all bids. If all bids for a project that requires bidding by law are rejected, the tenderee shall conduct a new bidding process in accordance with the law.
III. Legal Liability
1. Legal liability for affecting fair competition (a fine of not less than 3,000 yuan but not more than 50,000 yuan)
If the bid evaluation committee accepts benefits from the bidder, a fine of not less than 3,000 yuan but not more than 50,000 yuan may be imposed, and the qualification as a member of the bid evaluation committee shall be revoked.
2. Legal liability for negotiating with the bidder in advance (a warning to the tenderee, and disciplinary action against the unit or individual) The bid award is invalid.
1077 Mastering the requirements for bid award
I. Determining the winning bidder
(1) After the bid evaluation committee submits the written bid evaluation report, the tenderee shall generally determine the winning bidder within 15 days, but shall do so no later than 30 working days before the end of the bid validity period.
(2) The tenderee shall accept the winning bidder candidates recommended by the bid evaluation committee and shall not determine a winning bidder outside the candidates recommended by the bid evaluation committee.
(3) For projects that require bidding according to law, the tenderee shall determine the first-ranked winning bidder candidate as the winning bidder. If the first-ranked winning bidder candidate abandons the bid, is unable to perform the contract due to force majeure, or fails to submit the performance bond required by the tender documents within the specified period, the tenderee may determine the second-ranked winning bidder candidate as the winning bidder, and so on.
(4) The tenderee may authorize the bid evaluation committee to directly determine the winning bidder.
II. Notice of Award
(1) After the winning bidder is determined, the tenderee shall issue a notice of award to the winning bidder and simultaneously notify all bidders of the award result.
There are bidders who were not awarded the contract.
(2) The tenderer shall not make demands such as lowering the bid price, increasing the workload, shortening the construction period, or other requirements contrary to the winning bidder's wishes as conditions for issuing the notice of award and signing the contract.
(3) The bid-winning notice has legal effect on both the tenderee and the bidder. After the bid-winning notice is issued, if the tenderee changes the bid-winning result or the winning bidder abandons the project, they shall bear legal liability in accordance with the law.
III. Signing the Contract
1. The tenderee and the winning bidder shall, within 30 days from the date of issuance of the notice of award, enter into a written contract in accordance with the tender documents and the bid documents of the winning bidder. The tenderee and the winning bidder shall not enter into any other agreement that deviates from the substantive content of the contract.
2. If the parties enter into a separate construction contract for the same construction project that materially differs from the filed contract, the filed winning bid contract shall serve as the basis for settling the project price.
3. If the tender documents require the winning bidder to submit a performance bond or other form of performance guarantee, the winning bidder shall do so; refusal to submit shall be deemed as abandonment of the winning project. If the tenderer requires the winning bidder to provide a performance bond or other form of performance guarantee, the tenderer shall simultaneously provide the winning bidder with a guarantee for payment of project funds. The tenderer shall not arbitrarily increase the performance bond, nor shall it compel the winning bidder to advance funds for the construction of the winning project.
5. Within 5 working days after the tenderer signs the contract with the winning bidder, the tenderer shall return the bid security to the unsuccessful bidders.
6. Handling opinions:
1) If the parties have agreed on advance payment and its interest, the contractor's request for return of the advance payment and its interest in accordance with the agreement shall be supported, except for the portion where the agreed interest rate exceeds the interest rate for similar loans of the same period published by the People's Bank of China.
2) If the parties have not agreed on advance payment, it shall be handled as project arrears.
3) If the parties have not agreed on advance payment and the contractor requests payment of interest, such request shall not be supported.
IV. Written report on tendering and bidding status
For projects that require tendering according to law, the tenderer shall, within 15 days from the date of determining the winning bidder, submit a written report on the tendering and bidding status to the relevant administrative supervision department.
V. Legal liability
1. Legal liability for illegally determining the winning bidder (0.5% to 1% of the winning bid amount): If the winning bidder is determined by a party other than the tenderer, the responsible party shall be ordered to correct the violation and shall be fined 0.5% to 1% of the winning bid amount; the responsible individuals shall be given disciplinary action according to law.
2. Legal liability for illegally concluding a contract (0.5% to 1% of the winning bid amount): If an agreement that deviates from the substantive content of the contract is concluded, the responsible party shall be ordered to correct the violation and shall be fined 0.5% to 1% of the winning bid amount.
1078 Familiar with the bidding process
I. Conditions that should be met for bidding
(1) If the bidding project requires approval procedures in accordance with relevant national regulations, such procedures shall be completed first, and obtain
Approved.
(2) The tenderee shall have corresponding funds or a confirmed source of funds for the tendered project, and shall truthfully state this in the tender documents.
For a construction project that requires bidding according to law, the following conditions must be met before proceeding with the construction bidding:
1. The tenderee has been legally established;
2. The preliminary design and budget estimate, where approval procedures are required, have been approved;
3. The scope of tender, method of tender, and organization form of tender, which require approval procedures, have been approved.
4. The corresponding funds or sources of funds have been secured;
5. There are design drawings and technical materials required for the tender.
2. Tender Methods
Tender methods are divided into open tendering and invited tendering.
(1) Open Tendering
Open tendering, also known as unlimited competitive tendering, refers to the tenderee inviting unspecified legal persons or other organizations to bid by means of a tender announcement. Adopting open tendering can provide all potential bidders who meet the bidding conditions with an equal opportunity to participate and fully compete, which is conducive to the tenderee selecting the winning bidder. Where the tenderee adopts open tendering, it shall issue a tender announcement. The tender announcement for a project that requires tendering according to law shall be published through newspapers, information networks, or other media designated by the state.
(2) Invited Tendering
Invited tendering, also known as limited competitive tendering, refers to the tenderee inviting specific legal persons or other organizations to bid by means of invitation to bid. With this tendering method, because the number of potential bidders invited to compete is limited and the tenderee has already conducted investigations and understanding in advance, it can not only save the tenderee's tendering costs but also increase the probability of bidders winning the bid, so potential bidders will have higher enthusiasm for bidding.
Under any of the following circumstances, invited tendering may be conducted upon approval:
1. The project is technically complex or has special requirements, and only a few potential bidders are available for selection;
2. It is restricted by natural geographical environmental conditions;
3. Involving national security, state secrets, or emergency rescue and disaster relief, where bidding is appropriate but open bidding is not suitable;
4. Where the cost of open bidding is not justified compared to the value of the project;
5. Where laws and regulations stipulate that open bidding is not appropriate.
When a tenderer adopts the method of invited bidding, it shall issue invitations for bids to three or more specific legal persons or other organizations that have the capability to undertake the bidding project and possess good credit standing.
(III) Tender Announcement or Invitation for Bids
The tender announcement or invitation for bids shall at least specify the following: the name and address of the tenderer, the nature and quantity of the bidding project, the location and time of implementation, and the method for obtaining bidding documents.
Qualification Review
Qualification review is divided into pre-qualification and post-qualification.
1. Pre-qualification
Pre-qualification refers to the qualification review of potential bidders before bidding. When adopting pre-qualification, the tenderer may issue a pre-qualification announcement, and the provisions regarding tender announcements shall apply to the pre-qualification announcement.
2. Post-qualification review
Post-qualification review refers to the examination of bidders' qualifications conducted after the bid opening. Where pre-qualification has been conducted, post-qualification review is generally no longer carried out, unless otherwise specified in the tender documents. Where post-qualification review is adopted, the tenderee shall specify in advance in the tender documents the conditions, standards, and methods for bidder qualification requirements, and shall not alter the stated qualification conditions or conduct post-qualification review of bidders based on qualification conditions not stated therein. A bid submitted by a bidder who fails the post-qualification review shall be treated as a rejected bid.
IV. Tender documents
(1) Sale of tender documents (sale of drawings; sale of items other than drawings)
The tenderee shall sell the tender documents at the time and place specified in the tender announcement or the invitation to bid. The period from the date of commencement of sale of the tender documents to the date of cessation of sale shall not be less than 5 working days. The charge for the tender documents shall be reasonable and shall not be for profit-making purposes. The tenderee shall not arbitrarily terminate the tendering after publishing the tender announcement or issuing the invitation to bid, or after selling the tender documents or pre-qualification documents.
(2) The tender documents shall include all substantive requirements and conditions, such as the technical requirements of the tendered project, the standards for examining bidders' qualifications, the requirements for bid pricing, and the bid evaluation criteria, as well as the main clauses of the contract to be signed.
(3) Requirements for tender documents
1. The tender documents shall not require or designate specific production suppliers, nor contain other content that favors or excludes potential bidders. Preparing a base price is not mandatory; the tenderee may not set a base price and conduct tendering without one. Where the tenderee sets a base price, it shall be kept confidential. Only one base price may be prepared for a single project.
2. Where the tenderee makes necessary clarifications or modifications to the issued tender documents, it shall notify all recipients of the tender documents in writing at least 15 days before the deadline for submission of bids required by the tender documents. Such clarifications or modifications shall form part of the tender documents.
In the tender documents, the tenderee shall determine a reasonable period of time for bidders to prepare their bids; however, for projects that are required by law to be tendered, the period from the date of commencement of issuance of the tender documents to the deadline for submission of bids by bidders shall not be less than 20 days. The tender documents shall specify an appropriate bid validity period to ensure that the tenderee has sufficient time to complete bid evaluation and sign the contract with the winning bidder. The bid validity period shall be calculated from the deadline for submission of bids by bidders.
If special circumstances occur before the original bid validity period ends, the tenderee may request in writing that all bidders extend the bid validity period. Bidders who agree to the extension shall not request or be allowed to modify the substantive content of their bids, but shall correspondingly extend the validity period of their bid bonds (30 days); bidders who refuse the extension shall have their bids become invalid, but they are entitled to recover their bid bonds. If losses are caused to bidders due to the extension of the bid validity period, the tenderee shall provide compensation, except when the extension is necessitated by force majeure.
3. Regarding the content of the bidding documents
Stipulations: 1) Principle requirements
If the state has regulations on the technology and standards of the bidding project, the tenderee shall propose corresponding requirements in the bidding documents in accordance with such regulations. If the bidding project requires division into sections or determination of the construction period, the tenderee shall reasonably divide the sections and determine the construction period, and specify these in the bidding documents.
The bidding documents shall not require or specify particular suppliers or producers, nor contain content that favors or excludes potential bidders.
2) Technical requirements
(1) Technical standards shall comply with national mandatory standards (2) Reasonably divide sections and determine the construction period (3) Scientifically prepare the base price
Note: 1. For construction bidding projects with a construction period exceeding twelve months, the bidding documents may stipulate the engineering cost index system, price adjustment factors, and adjustment methods. 2. The tenderee may decide whether to prepare a base price based on the project characteristics, and it must be kept confidential.
1079 Understanding the bidding organization form and bidding agency
I. Bidding organization form
The forms of tendering organization include self-conducted tendering and entrusted tendering. Self-conducted tendering refers to the tenderer having the capability to prepare tender documents and organize bid evaluation, and being legally allowed to handle the tendering process on its own; entrusted tendering refers to the tenderer entrusting a tendering agency to handle the tendering matters. If the tenderer is legally allowed to conduct tendering on its own, no entity or individual may force it to entrust a tendering agency to handle the tendering matters; if the tenderer opts for entrusted tendering, it has the right to choose the tendering agency independently, and no entity or individual may designate a tendering agency for the tenderer in any way.
For projects that require tendering by law, if the tenderer handles the tendering matters on its own, it shall file a record with the relevant administrative supervision department.
2. Tendering Agency
shall file a record with the relevant administrative supervision department.
2. Tendering Agency
(1) Definition: Refers specifically to tendering agencies for construction projects.
(2) Nature
A tendering agency is a social intermediary organization established in accordance with the law, engaged in tendering agency services and providing related services. A tendering agency shall not have any subordinate relationship or other interest relationship with administrative organs or other state organs.
A tendering agency shall meet the following conditions:
1. Having a business premises and corresponding funds for engaging in tendering agency services
2. Having the corresponding professional capabilities to prepare tender documents and organize bid evaluation
3. There is a database of technical and economic experts who can serve as members of the bid evaluation committee.
(III) Bidding matters that a bidding agency may undertake
A bidding agency may undertake the following bidding matters within its qualification grade:
1. Drafting bidding plans, preparing and mailing bidding documents and prequalification documents
2. Reviewing bidder qualifications
3. Preparing the base bid price
4. Organizing site visits for bidders
5. Organizing bid opening and evaluation, and assisting the tenderee in bid award
6. Drafting contracts
7. Other matters entrusted by the tenderee
The bidding agency shall not accept both the bidding agency service and bidding consulting service for the same project at the same time, and shall not transfer the bidding agency business without the consent of the tenderer.
(IV) Qualifications and Business Scope
The competent construction department of the State Council is responsible for the management of qualification accreditation for engineering bidding agencies nationwide. The competent construction departments of the people's governments of provinces, autonomous regions, and municipalities directly under the Central Government are responsible for the management of qualification accreditation for engineering bidding agencies within their respective administrative regions. The qualifications of engineering bidding agencies are divided into Grade A, Grade B, and provisional grade. Grade A is unrestricted; Grade B engineering bidding agencies may only undertake bidding agency business for projects with a value of less than 100 million yuan. Provisional grade engineering bidding agencies may only undertake bidding agency business for projects with a value of less than 60 million yuan.
III. Legal Liability
If a bidding agency violates regulations, it shall be fined not less than 50,000 yuan but not more than 200,000 yuan; the person directly in charge of the unit shall be fined not less than 5% but not more than 10% of the fine imposed on the unit; the bidding agency shall be suspended or even revoked. The winning bid shall be invalid.