Project Name: New Teaching Building Project of Cuizhai Town Middle School
Construction Unit: Jiyang County Cuizhai Town Middle School
Structural Form: Frame Structure
Project Cost: 11,251,442.9 Yuan
Building Area: 5,675.36 m²
The teaching building construction manufacturer tells you: cadres and engineering technicians at all levels of construction management units need to master and conscientiously implement the various provisions of the "Safety Technical Regulations for Building and Installation Engineering"; workers of various trades need to be familiar with the safety technical operation procedures of their own trade. Any technical personnel who do not understand building safety regulations and workers or migrant workers who have not undergone safety technical training are not allowed to participate in construction.
To achieve safe production and civilized production, it is necessary to prepare a construction organization design before construction and make a good construction site layout. The locations of all ancillary facilities, mechanical installation, transportation roads, water supply and drainage systems, power grids, steam pipelines, and other temporary projects need to be carefully and reasonably arranged in the construction organization design site planning, so as to achieve both safety and civilization, as well as reasonable use of space and plane.
The construction site should be surrounded by fences. Dangerous areas such as cliffs and steep slopes should be equipped with fences and warning signs, and red lights should be set up at night for warning. The ground of the construction site should be level, and ditches and pits should be filled or covered with cover plates.